Line 1: |
Line 1: |
| {{PreservesJarProductivity-top}} | | {{PreservesJarProductivity-top}} |
| + | {{Stub|g/day needs recalculating after 1.4 change to processing time in a day}} |
| This page lists the productivity of processing [[Fruits]] and [[Vegetables]] into [[Jellies and Pickles]] in a [[Preserves Jar]]. | | This page lists the productivity of processing [[Fruits]] and [[Vegetables]] into [[Jellies and Pickles]] in a [[Preserves Jar]]. |
| | | |
Line 10: |
Line 11: |
| '''Productivity (g/minute)''' = <code>([Processed Sell Price] - [Input Item Sell Price]) / 4000</code> | | '''Productivity (g/minute)''' = <code>([Processed Sell Price] - [Input Item Sell Price]) / 4000</code> |
| | | |
− | '''Approximate g/day''' = <code>Productivity (g/minute) * 1680</code> <ref name="timing details" /><ref name="day length" /> | + | '''g/day''' = <code>Productivity (g/minute) * 1600</code> <ref name="timing details" /> |
| | | |
| | | |
Line 22: |
Line 23: |
| !Increase in Value (g) | | !Increase in Value (g) |
| !Productivity (g/minute) | | !Productivity (g/minute) |
− | !Approximate g/day<ref name="timing details" /><ref name="day length" /> | + | !g/day<ref name="timing details" /> |
| |- | | |- |
| |style="text-align: left;"|{{name|Amaranth}} | | |style="text-align: left;"|{{name|Amaranth}} |
Line 624: |
Line 625: |
| ==References== | | ==References== |
| <references> | | <references> |
− | <ref name="timing details">For whatever reason, processing time calculates differently while sleeping versus being awake. 1 hour equals 60 minutes when awake but, equals 100 minutes when sleeping.<br />So if you sleep a whole day, the machine would process 2400 minutes. (100 * 24).<br />If you work from 6:00AM till 12:00AM, and sleep 6 hours, the machine will process 1680 mins a day. (60 * 18 + 100 * 6)<br />If you work from 6:00AM. till 2:00AM, and faint 4 hours, the machine will process 1600 mins a day. (60 * 20 + 100 * 4)<br />For example, Preserves Jars need 4000 minutes to work. If you sleep the whole process, you need to sleep 40 hours, less than 2 days. If you work 18 hours a day, it takes 2 days, 10 hours and 40 minutes.</ref> | + | <ref name="timing details">Processing time calculates differently during the night between 2am to 6 am, each hour processing an extra 40 minutes for a total of 100 minutes. For a 4,000 minute processing time this results in either sleeping for 2 nights with 13 hours 20 minutes split between before the first night and after waking on the day processing completes, or 3 nights with an additional 6 hours 40 mimnutes split between before the first night and after waking on the day processing completes.<br/> |
− | <ref name="day length">Assuming an effectively 1680 minute day, sleeping midnight - 6:00AM</ref>
| + | For example, if placing a vegetable(4,000 minutes processing required) into a preserves jar on Monday at 9:00am, the pickles will be ready for collection at 10:20pm on Wednesday. If a fruit(4,000 minutes processing required) was then immediately placed into the preserves jar, the jam will be ready for collection at 9:00 am on Saturday. As can be seen, this results in 2 full processings every five days.<br/> |
| + | Starting processng between 12:40pm to 7:20pm will result in 'lost' processing time due to processing completing during the 2am-6am period of the night. |
| + | </ref> |
| <ref name="notill">Foraged item that does not benefit from the Tiller Profession</ref> | | <ref name="notill">Foraged item that does not benefit from the Tiller Profession</ref> |
| </references> | | </references> |