Changes

corrected reference for 1.4 changes.
Line 1: Line 1:  
{{PreservesJarProductivity-top}}
 
{{PreservesJarProductivity-top}}
 +
{{Stub|g/day needs recalculating after 1.4 change to processing time in a day}}
 
This page lists the productivity of processing [[Fruits]] and [[Vegetables]] into [[Jellies and Pickles]] in a [[Preserves Jar]].
 
This page lists the productivity of processing [[Fruits]] and [[Vegetables]] into [[Jellies and Pickles]] in a [[Preserves Jar]].
   Line 10: Line 11:  
'''Productivity (g/minute)''' = <code>([Processed Sell Price] - [Input Item Sell Price]) / 4000</code>
 
'''Productivity (g/minute)''' = <code>([Processed Sell Price] - [Input Item Sell Price]) / 4000</code>
   −
'''Approximate g/day''' = <code>Productivity (g/minute) * 1680</code> <ref name="timing details" /><ref name="day length" />
+
'''g/day''' = <code>Productivity (g/minute) * 1600</code> <ref name="timing details" />
      Line 22: Line 23:  
!Increase in Value (g)
 
!Increase in Value (g)
 
!Productivity (g/minute)
 
!Productivity (g/minute)
!Approximate g/day<ref name="timing details" /><ref name="day length" />
+
!g/day<ref name="timing details" />
 
|-
 
|-
 
|style="text-align: left;"|{{name|Amaranth}}
 
|style="text-align: left;"|{{name|Amaranth}}
Line 624: Line 625:  
==References==
 
==References==
 
<references>
 
<references>
<ref name="timing details">For whatever reason, processing time calculates differently while sleeping versus being awake. 1 hour equals 60 minutes when awake but, equals 100 minutes when sleeping.<br />So if you sleep a whole day, the machine would process 2400 minutes. (100 * 24).<br />If you work from 6:00AM till 12:00AM, and sleep 6 hours, the machine will process 1680 mins a day. (60 * 18 + 100 * 6)<br />If you work from 6:00AM. till 2:00AM, and faint 4 hours, the machine will process 1600 mins a day. (60 * 20 + 100 * 4)<br />For example, Preserves Jars need 4000 minutes to work. If you sleep the whole process, you need to sleep 40 hours, less than 2 days. If you work 18 hours a day, it takes 2 days, 10 hours and 40 minutes.</ref>
+
<ref name="timing details">Processing time calculates differently during the night between 2am to 6 am, each hour processing an extra 40 minutes for a total of 100 minutes. For a 4,000 minute processing time this results in either sleeping for 2 nights with 13 hours 20 minutes split between before the first night and after waking on the day processing completes, or 3 nights with an additional 6 hours 40 mimnutes split between before the first night and after waking on the day processing completes.<br/>
<ref name="day length">Assuming an effectively 1680 minute day, sleeping midnight - 6:00AM</ref>
+
For example, if placing a vegetable(4,000 minutes processing required) into a preserves jar on Monday at 9:00am, the pickles will be ready for collection at 10:20pm on Wednesday. If a fruit(4,000 minutes processing required) was then immediately placed into the preserves jar, the jam will be ready for collection at 9:00 am on Saturday. As can be seen, this results in 2 full processings every five days.<br/>
 +
Starting processng between 12:40pm to 7:20pm will result in 'lost' processing time due to processing completing during the 2am-6am period of the night.
 +
</ref>
 
<ref name="notill">Foraged item that does not benefit from the Tiller Profession</ref>
 
<ref name="notill">Foraged item that does not benefit from the Tiller Profession</ref>
 
</references>
 
</references>
610

edits