Changes

Jump to navigation Jump to search
736 bytes removed ,  17:08, 17 September 2018
→‎The Passage of Time: So many problems with this.
Line 11: Line 11:     
For example, Preserves Jars need 4000 mins to work. If you sleep the whole process, you need to sleep 40 hours, less than 2 days. If you work 18 hours a day, it takes 2 days, 10 hours and 40 minutes.
 
For example, Preserves Jars need 4000 mins to work. If you sleep the whole process, you need to sleep 40 hours, less than 2 days. If you work 18 hours a day, it takes 2 days, 10 hours and 40 minutes.
  −
In addition, for Bee House (as well as Tapper, Worm Bin and mushroom boxes in the cave), the time left will intermediately be subtracted by the time already passed this day as it is placed or a product is harvested, start from 00:00 (so past 00:00 will make much less time to be subtracted), and each whole hour passed will be count as 100 minutes.
  −
  −
For example, the base time needed for a Bee House is 6720 minutes. If you harvest a Honey on 6:00AM, the actual time left will be 6120 minutes(6720 - 600), if on 10:40PM, it will be 4480 minutes (6720 - 2240), and if on 00:20, the actual time left will be 6700 minutes (6720 - 20). 
  −
  −
Finally, for cask, the time passed is calculated by the actual day passed rather than time passed.
      
==Production Machines==
 
==Production Machines==
105,639

edits

Navigation menu