Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1: −
{{PreservesJarProductivity-top}}
+
{{PreservesJarProductivity-top}}{{Review|Update spreadsheet for v1.4}}
 
This page lists the productivity of processing [[Fruits]] and [[Vegetables]] into [[Jellies and Pickles]] in a [[Preserves Jar]].
 
This page lists the productivity of processing [[Fruits]] and [[Vegetables]] into [[Jellies and Pickles]] in a [[Preserves Jar]].
   Line 1,220: Line 1,220:  
==References==
 
==References==
 
<references>
 
<references>
<ref name="timing details">Processing time calculates differently during the night between 2am to 6 am, each hour processing an extra 40 minutes for a total of 100 minutes. For a 4,000 minute processing time this results in either sleeping for 2 nights with 13 hours 20 minutes split between before the first night and after waking on the day processing completes, or 3 nights with an additional 6 hours 40 mimnutes split between before the first night and after waking on the day processing completes.<br/>
+
<ref name="timing details">One hour = 60 minutes from 6am to 2am, but 1 hour = 100 minutes from 2am to 6am. One day of processing time = (60 * 20) + (100 * 4) = 1600 minutes.
For example, if placing a vegetable(4,000 minutes processing required) into a preserves jar on Monday at 9:00am, the pickles will be ready for collection at 10:20pm on Wednesday. If a fruit(4,000 minutes processing required) was then immediately placed into the preserves jar, the jam will be ready for collection at 9:00 am on Saturday. As can be seen, this results in 2 full processings every five days.<br/>
  −
Starting processng between 12:40pm to 7:20pm will result in 'lost' processing time due to processing completing during the 2am-6am period of the night.
   
</ref>
 
</ref>
 
</references>
 
</references>
105,955

edits

Navigation menu