Pickles

Revision as of 04:27, 2 November 2017 by Nukken (talk | contribs) (Undo revision 63699 by Margotbean (talk))
Pickles
Blank icon.png
A jar of your home-made pickles
Information
Source Artisan Goods
Energy Inedible
Sell Price data-sort-value="150">Gold.png150g
Artisan Goods
Equipment Preserves Jar.png Preserves Jar
Processing Time Time Icon.png 4,000m (≈3d)
Ingredients Any Vegetable (1)
For a detailed analysis of profit using the Preserves Jar, see Preserves Jar Productivity.

Pickles are an Artisan Good produced by inserting a Vegetable in a Preserves jar.

The value of a single jar of pickles is equal to (2 * Base Crop Value + 50).

A Preserves Jar requires 4000 minutes to produce pickles. This will take 2-3 days, depending on sleep habits. [1]

Bundles

It is not used in any Bundles

Quests

It is not used in any Quests

Recipes

It is not used in any Recipes

Trivia

  • Pickles sold by the Travelling Cart will not be of any vegetable type and will sell for data-sort-value="100"> 100g.

Products

Quality of ingredients makes no difference to the finished product. The value of the finished product is determined using the base value (i.e., with no silver or gold star) of the vegetable. However, the preserved version is always more profitable than even gold star produce, although the profit margin is lower compared to normal produce.

Gifting Pickles

Villager Reactions

Love   Harvey
Like   Abigail  Alex  Caroline  Clint  Demetrius  Dwarf  Elliott  Emily  Evelyn  George  Gus  Haley  Jodi  Kent  Krobus  Leah  Lewis  Linus  Marnie  Pam  Penny  Pierre  Robin  Sandy  Willy  Wizard
Hate   Jas  Maru  Sam  Sebastian  Shane  Vincent

References

  1. For whatever reason, processing time calculates differently while sleeping versus being awake. 1 hour equals 60 minutes when awake but, equals 100 minutes when sleeping. So if you sleep a whole day, the machine would process 2400 minutes. (100 * 24) If you work from 6:00AM till 12:00AM., and sleep 6 hours, the machine will process 1680 mins a day. (60 * 18 + 100 * 6) If you work from 6:00AM. till 2:00AM, and faint 4 hours, the machine will process 1600 mins a day. (60 * 20 + 100 * 4) For example, Preserves Jars need 4000 minutes to work. If you sleep the whole process, you need to sleep 40 hours, less than 2 days. If you work 18 hours a day, it takes 2 days, 10 hours and 40 minutes.